Who is covered by the SPCC Oil Spill Regulations?
Any facility meeting the three criteria (a non-transportation related facility with sufficient storage capacity which could discharge oil to navigable waters) must comply with the Spill Prevention, Control and Countermeasure regulations. Any facility having an aboveground aggregate storage capacity greater than 1,320 gallons of oil without secondary containment must meet SPCC regulations.
Some Regulated Facilities:
- Industrial, commercial, or public facilities that use, store, produce, gather, process, refine or consume oil or oil products
- Waste treatment facilities
- Highway vehicles and railroad cars used to transport oil within the confines of a non-transportation related facility
- Loading areas/racks, transfer hoses, loading arms and other equipment that are part of a non-transportation related facility
What is “Oil Storage Capacity?”
Capacity includes all containers storing oil at the facility. Each container’s maximum volume must be taken into consideration and not the actual amount of product stored. Oil storage containers can include, but are not limited to, above ground storage tanks, drums, and oil filled equipment.
Could the facility discharge oil into a regulated waterway?
A determination is based upon the geographical and locational aspects of the facility in relation to its proximity to: | |
|
|
The distance to navigable waters, volume of material stored, weather conditions, drainage, and soil type must be taken into account. The determination shall not consider man-made structures such as dikes, berms, or other features that may restrain, hinder, contain or prevent an oil discharge. |
Could the facility discharge oil into a regulated waterway?
A determination is based upon the geographical and locational aspects of the facility in relation to its proximity to: | |
|
|
The distance to navigable waters, volume of material stored, weather conditions, drainage, and soil type must be taken into account. The determination shall not consider man-made structures such as dikes, berms, or other features that may restrain, hinder, contain or prevent an oil discharge. |
Who prepares the SPCC Plan?
Any authorized environmental consultant, engineer or scientist may write a facility’s SPCC Plan. However, the Plan must be prepared in accordance with standard engineering practices and certified by a Professional Engineer.
What do I have to do to comply?
The regulations require owner/operator’s to prepare a plan for their facility within six months of becoming operational and to implement the plan within twelve months of the start of the operations.
Background:
In July 2002, EPA amended the Oil Pollution Prevention regulation often referred to as the ‘SPCC rule’. The rule describes the requirements for facilities to prepare, amend and implement an SPCC Plan. These plans are the foundation of EPA’s strategy to prevent or contain oil spills, requiring facilities to put in place countermeasures which will prevent oil spills from reaching the nation’s waterways. Under the law, facilities must implement specific spill prevention and control measures.
Every SPCC Plan has certain basic requirements while, at the same time, each plan must be tailored to the facility it serves.
As part of its enforcement program, EPA conducts unscheduled on-site inspections. Any facility that has had two or more discharges over 42 gallons in any 12-month period or a single discharge of more than 1,000 gallons will be subject to closer scrutiny and more stringent reporting requirements.
Plan Coverage:
SPCC Plans must be certified by a professional engineer and be signed by a person with the authority to implement the Plan and take responsibility for its success or failure. The Plan must address these three areas:
- Operating procedures that prevent oil spills
- Control measures installed to prevent a spill from reaching navigable waters
- Countermeasures to contain, clean up, and mitigate the effects of an oil spill that reaches navigable waters
Required Elements
The SPCC Plan must include certain standard elements including: | |
|
Enforcement
The inspection is the first step of several steps in the enforcement process. If violations are noted during an inspection, the TCEQ may give the respondent a verbal notice to correct all violations within 14 days, send a notice of violation (NOV) alleging violations found and request the submittal of a compliance schedule to resolve the violations or begin formal enforcement if the violations have not been resolved through a NOV or are significant. | |
Formal enforcement will usually result in a TCEQ order to correct the violations and pay administrative penalties. This process may include a hearing and frequently involves attorneys for both parties. | |
EPA may assess criminal, judicial or administrative penalties against oil or hazardous substance dischargers as well as facility owners/operators who fail to comply with the Oil Pollution Prevention regulation. Depending on the jurisdiction, the new system allows for penalties of up to $10,000 per violation, $10,000 per day, $25,000 per day or up to $1,000 per barrel of oil spilled, $100,000 per violation, $250,000 for an individual or $500,000 for a corporation, and a maximum prison sentence of five years. |